more details
more details
more details
Kuwait Sheraton Hotel Extension Print E-mail
Contract Value:
K.D 224,000
Completed On: 1971
Client: Kuwait Sheraton Hotel
Consultant: Pan Arab
This was the first extension made on the existing Kuwait Sheraton.

It consisted of 120 rooms, grand ballroom located on the roof, restaurant on the ground floor, and a basement to house the kitchen and laundry service rooms.

The architectural concept and appearance of the extension are in adherence to the old building design.

The structure is made of cast in-situ reinforced concrete.

The external works, pergolas, and surrounding pavement were also made to be in harmony with the older building.
 
 
   Copyright ©2012 Al-Hani Construction & Trading Co. All rights reserved. Privacy Policy