|
The Central Bank of Kuwait |
|
|
| | Contract Value:
| K.D. 250,000 | Completed On:
| 1975 | Client:
| Ministry of Finance | | Consultant: | Ministry of Electricity and Water | | The air-conditioning works of this project presented peculiar problems with respect to the control of the noise level and the airflow due to the required "throw" of the supply. | | The fresh-air intake network had to be geometrically coordinated with the building layout so that the system did not clash with the fixed glazing which dominated the elevations. | | The company successfully commissioned the project within the available time. |
|